Features of iTEC Design Change System
ECN (Engineering Change Notice)
After the release of ECR (Engineering Change Request) and ECN (Engineering Change Notice), the complete change history will be recorded, and a dataset will be provided as a crucial reference for the improvement of the next-generation product.
RD Batch Change Operation
The system initiates ECN (Engineering Change Notice) changes from the source and generates corresponding change orders through an end-to-end automated process, including purchase requisition change orders, procurement change orders, in-house manufacturing change orders, and outsourced manufacturing change orders.
Depending on the different modes of design changes, production scheduling will undergo procurement and preparation again. When initiating design changes, several modes can be selected:
- New Order: Change the order.
- Specified Order: Change the Bill of Materials (BOM).
- Comprehensive: Change both the BOM and the order.
Advantages of iTEC ERP Design Change System

Replacing old part numbers in the inventory will generate real-time notifications to prevent excessive storage of inventory due to prolonged storage without proper utilization and planning.

Quickly generating changed products, with the ability to batch review and batch update, enhances the accuracy and immediacy of design changes.

Preserve essential documents from the research and development process by attaching them as files, and linking them to change applications to convert them into an internal knowledge base.
